Tie Into existing / #3 Shearwalls / Hold down connection
|
|
Click on any thumbnail you'll be brought a larger size picture with an explanation.
|
|
Garage #3 Shearwall
|
|
PHD8 Holdown
|
|
Layout
|
|
Connection
|
|
Left side tie in
|
|
Framing begins
|
|
Right Side tie in
(Shear wall) |
|
Right Side tie in
(Detail completed) |
|
Green Valley Project Framing 1
|
|
Alter Eagle
|
|
A design / build residential and light commercial construction company.
|
|
CL # 769640 General B / HIC
|
|
(707) 823-5145
|
|
The Green Valley Project
2 story addition, slab on grade, design build
The first floor framing page
|