2x6 forms used on a stepped footing & slab, stepped footing rebar, use of ties,
chamfer strips & 1x4 to place the forms & keep them plumb square, straight & level. A step footing rebar detail for clarification of placement. |
|
The floor framing sizes & spans, the make-up of pony walls from the foundation.
The design lay-out, beams & headers, rim joists & rake wall framing. |
|
The blocking required for shear wall & firestops. The roof framing gets added &
sheathed. The H2.5, LSU50, PHD2 connectors & strapping explained. |
|
The RB&B siding installation and as it pertains to shearwalls, the tractor port
construction, beams & roof. The decks added another small TREX project. |
|
The final shots of the barn from different sides
|
|
How I make and install deck stairs with closed risers & a skirt.
|
|
Click on any thumbnail you'll be brought a larger size picture with an explanation.
|
|
Oak Barn Project main
|
|
Alter Eagle
|
|
A design / build residential and light commercial construction company.
|
|
CL # 769640 General B / HIC
|
|
(707) 823-5145
|
|
The Oak Barn Project
1.5 story, stepped footing & slab, design build
The main page
|
|
"I think the design is super and you've done an
excellent job, maybe you'll build one for me next?"
The building inspector for this project.
"It turned out even better than I expected,
thank-you so very much!!"
The home owners.
|
|
I designed this one to take advantage of the grade, and to look like one of the old time
Dutch barns. It's a woodworking shop with a bonus room below. |